EST. 2015 · JEDDAH, KSA

The studio.

Engineers and craftsmen under one roof since 2015. Whoever draws, builds — in a 5,000 m² facility with twelve production lines, and a team that carries a project from idea to opening day.

01 The facility

One roof. Twelve production lines.

CP-ST-01Facility plan — schematic1 / 1
Facility plan — 5,000 m², twelve production linesABCDEFGA = 5,000 m² · 12 LINES · CENTRAL AISLE010203040506070809101112NTS · NOT TO SCALENCP-ST-01 · FACILITY PLAN · 5,000 m²

Swipe sideways to see the full plan →

Facility area
5,000m²
Production lines
12
Since
2015
  1. 01Project management
  2. 02Design studio
  3. 033D models
  4. 04Woodworking
  5. 05Blacksmithing
  6. 06Fit-out & furniture
  7. 07Painting
  8. 08Electricity
  9. 09Glass & acrylic
  10. 10Printing & signage
  11. 11Electromechanics
  12. 12Audio, video & lighting

Every line sits inside the same facility — which is why a “same-day last-minute change” is a promise in the contract, not a marketing line.

02 The team

One team carries the project.

  • Eng. Jihad Al ShaikhCP-T01

    CEO & FOUNDERالرئيس التنفيذي والمؤسس

    ENG. JIHAD AL SHAIKH

    م. جهاد الشيخ

    Interior architect with 20+ years in experience engineering & build. Founder & CEO of Crafters Production — hundreds of projects for government entities and global brands, from F1 Paddock Club hospitality to Pure Beach and the interactive Hajj-journey content at LEAP24.

  • Eng. Omar Kamel Al AnsariCP-T02

    SENIOR BUILDABILITY ADVISORكبير مستشاري قابلية التنفيذ

    ENG. OMAR KAMEL AL ANSARI

    م. عمر كامل الأنصاري

    20+ years in engineering, industrial manufacturing and event infrastructure; leading major national deliveries since 2019. Reviews every design detail through a manufacturer's eye — buildable, in what duration, at what real cost.

  • Artem SergienkoCP-T03

    Digital Media & Interactive Content Directorمدير الوسائط الرقمية والمحتوى التفاعلي

    ARTEM SERGIENKO

    أرتيم سيرغينكو

    20+ years in digital media & interactive content. Projects with the Russian Museum and the Osthaus Museum (Germany); UAE work with Audi Dubai and TAMM. Expert in Cinema 4D, 3Ds Max and Adobe Suite.

  • Joseph KiblitskyCP-T04

    Sr. International Advisor · Museumsمستشار دولي أول — المتاحف

    JOSEPH KIBLITSKY

    جوزيف كيبليتسكي

    Director of the Ludwig Museum (St. Petersburg) since 1995; 30+ years in international museum curation. Over 800 catalogues and exhibitions — Picasso, Kandinsky, Chagall, Malevich.

  • Anwar JamaliCP-T05

    LOGISTICS MANAGERمدير اللوجستيات

    ANWAR JAMALI

    أنور جمالي

    18+ years in logistics, warehousing and supply chains: process optimisation, inventory control and team leadership to high safety and performance standards.

03 The story

Fourteen milestones since 2015.

  1. 2015
    01 / 14

    The first craftsman — learning the trade from the inside

    Eng. Jihad Al Shaikh, interior architect, more than a decade inside the events industry — on sites, not in offices. The idea born there: whoever draws must build.

  2. 2015
    02 / 14

    Crafters was born in Jeddah — and entered the race fast

    A factory serving the market with its own hands: craftsmen who make, not middlemen who coordinate. Headquartered in Al Khalidiyah, with a production factory from day one.

  3. 2016
    03 / 14

    The first global brands enter the factory

    A night-time sports arena built entirely in-house, and a full Vogue fashion experience in Jeddah — the first projects to put the Crafters name in front of global brands that know exactly what they want.

  4. 2018
    04 / 14

    The brands come back — because what was drawn was built as drawn

    Three global brands in one year: a display platform for Rolex, golden containers and show trucks for Pepsi and Lay’s — projects measured by speed of execution and precision of detail.

  5. 2019
    05 / 14

    We entered the Seasons — by building the facades

    The MINI pavilion at Riyadh Season with a full dome, Bridgestone’s 70th anniversary with a theatrical chandelier — and the first facades we built for the Kingdom’s Seasons, where scale and duration decide who stays.

  6. 2020
    06 / 14

    The world stopped gathering — we did not stop solving

    A year without events is a test for any events company. We proved we could find solutions to problems nobody had seen before — and that became a habit.

  7. 2021
    07 / 14

    Into systems — a control room for the entire dome screen array

    In Jeddah we built the control room for a major dome venue, with full control of its screens — the first project where we ran the systems and control, not the structures alone.

  8. 2022
    08 / 14

    Private projects — experiences designed for their owner alone

    Projects with no public audience: designed, engineered and delivered for the owner and their guests, to the standards of fine hospitality and complete confidentiality.

  9. 2023
    09 / 14

    The Diamond Night — we entered the scale of live concerts

    A concert at the scale of major live shows: a 40-metre-wide stage and an integrated system of elements — the 7-tonne rotating crystal dome was only one of them. Delivered on time.

  10. 2024
    10 / 14

    Technology enters our stands — VR and 3D content

    At the Ministry of Hajj pavilion at LEAP we started developing the content ourselves: VR experiences and 3D content inside the stand — we no longer build only the structure, but what is shown in it.

  11. 2025
    11 / 14

    An integrated platform: 5,000 m² and twelve production lines under one roof

    Two factories bring us closer to every site in the Kingdom. Here “same-day last-minute change” became a promise in the contract, not a marketing line.

  12. 2026
    12 / 14

    We now build permanent leisure destinations

    Whoever studies the feasibility is whoever builds: from temporary events to destinations that stay — framing the vision and tender documents, then delivering the Oasis project, under one contract and one point of accountability.

  13. 2030
    13 / 14

    The first reference for experience engineering & build in the Kingdom and the Middle East

    Not a goal we announce — but the direction every step we take today is measured against: the stage built tomorrow, the destination opening next year.

  14. Vision
    14 / 14

    We believe in continuous improvement: small steps, every day, without stopping — raising the standards of the experience industry and establishing Crafters as a leading name in the field.

04 Your next project

Whoever draws, builds.

Tell us about your project — we read every brief ourselves.