Beach destination build · 2021
Pure Beach @ KAEC
A beach destination from day one to operation — consultant and builder in one.

- 0→1concept to operation
- 2021delivered
The starting point
A beach inside a protected area — and the brief was a complete, working destination, not temporary decor.
What we built
We developed the concept from day one, delivered the infrastructure and all facilities inside the protected area and the landscaping, and fabricated and installed the destination: shades, daybeds, pergolas and swings — plus a full operation and investment study.
The result
Whoever studies the feasibility builds it: one project, one point of accountability, from the first drawing to opening day.



Something like this in mind?
Start a similar projectNext project
Souda Season — Aseer Highlands


