Five concerts on one arena stage in seven weeks: we built the scenography once, then re-dressed it for each artist within days.

CP-JS-01 · BenchmarkSHEET 12/29
Jeddah Season Concerts 2024
  • 5concerts in the season
  • 7weeks, first show to last
  • 700m²stage platform, in two concerts

The starting point

Benchmark programmed a summer run of concerts at Abadi Al Johar Arena in Jeddah and needed one partner to build the stage scenography and then re-dress it for each artist, sometimes within days of the brief. The shows: Omar Khayrat (26 July), Elissa & Ramy Sabry (8 August), Tamer Hosny (15 August), Ahmed Saad & Cairokee (22 August) and Tamer Ashour (6 September), with additional set work for Angham on 13 September.

What we built

Omar Khayrat: a gold-and-black façade with a gold arc and fabric wings. Elissa & Ramy Sabry: the existing set resized, the back of the steps reinforced, extra stage levels and LED strip on the riser. Tamer Hosny: a new steel-and-wood façade with two fabric layers, a 700 m² platform in 18 mm MDF with moquette, and a 9.76 × 3.66 m catwalk extension. Ahmed Saad & Cairokee: the enclosure re-skinned in 1,584 m² of white and 150 m² of black fabric stitched on site. Tamer Ashour: a façade 25.10 m per side and 16.80 m high with wavy double-layer styrofoam contouring and LED, a riser with cable cover and lighting, and 90 m of skirting.

The result

All five concerts were delivered. What the series showed best is that one stage can be re-dressed artist after artist: the Elissa refit and the Cairokee re-skin each came together in days, not weeks. Every set was modelled in 3ds Max and AutoCAD over the arena drawings, and a separate contractor handled sound and screens. The main photo and the installation shots are from site in September 2024; the last images are 3D design renders of the September set.

The stage under show lighting during the light test
The stage under show lighting during the light test.
The wavy gold screen frame during installation
The wavy gold screen frame during installation.
The wavy riser platform under construction
The wavy riser platform under construction.
The hall mid-install: the side screens and seating
The hall mid-install: the side screens and seating.
The stage from the hall under show lighting
The stage from the hall under show lighting.
The gold arch and the back screen
The gold arch and the back screen.
The curved LED screen from stage level
The curved LED screen from stage level.
Dining tables in front of the stage
Dining tables in front of the stage.
The balcony and the hall seating
The balcony and the hall seating.
The hall under show lighting, with the dining tables
The hall under show lighting, with the dining tables.
3D design render: the September set from the middle of the hall
3D design render: the September set from the middle of the hall.
3D design render: the full façade
3D design render: the full façade.
3D design render: the wavy riser
3D design render: the wavy riser.
3D design render: the side wing
3D design render: the side wing.
3D design render: the set from stage level
3D design render: the set from stage level.

Something like this in mind?

Start a similar project

Next project

Winter Vibes — Jeddah & the Asian Cup Watch Zone